Det viser seg at du har jobbet strukturert, gratulerer!
Tab Item Content
Process flow step 1
Check whether one or more management systems are applicable and determine the applicable standards.
Process flow step 2
Evaluate whether the organization is eligible for multisite certification.
Process flow step 3
Evaluate whether the organization is eligible for multisite certification.
Process flow step 4
Determine the number of sampled sites.
Process flow step 5
Determine the Effective Number of Persons (ENP) for each management system at each site (when relevant)
Process flow step 6
Determine the complexity level for each management system at each site (when applicable)
Process flow step 7
Determine the audit time for each management system at each site (as applicable)
Process flow step 8
Determine the adjustment factors in reduction or increase for each management system at each site (when applicable)
Process flow step 9
In case of multi-site, determine further reduction in audit time for each site (when applicable)
Process flow step 10
In the case of multiple management systems, check whether there are conditions for conducting an integrated audit.
Process flow step 11
Determine the starting point for the total audit time of the integrated management system (IMS)
Process flow step 12
Adjust the starting point figure by considering factors that may increase or reduce the required audit time.
Check whether one or more management systems are applicable and determine the applicable standards.
Link: ISO 17021-1:2015 clause 9.1.4
IAF MD 5:2019 Determination of Audit Time of Quality Management System
IAF MD 5:2019 Determination of Audit Time of Environmental Management Systems
IAF MD 5:2019 Determination of Audit Time of Occupational Health & Safety Management Systems
Evaluate whether the organization is eligible for multisite certification.
IAF MD 5:2019 Determination of Audit Time of Environmental Management Systems
IAF MD 5:2019 Determination of Audit Time of Occupational Health & Safety Management Systems
Evaluate whether site sampling is appropriate or not
Determine the Effective Number of Persons (ENP) for each management system at each site (when relevant)
Effective number of personnel | Audit time |
---|---|
1-5 | 1.5 hours |
6-10 | 2 hours |
11-15 | 2.5 hours |
16-25 | 3 hours |
26-45 | 4 hours |
46-65 | 5 hours |
66-85 | 6 hours |
66-85 | 6 hours |
86-125 | 7 hours |
126-175 | 8 hours |
176-275 | 9 hours |
276-425 | 10 hours |
426-625 | 11 hours |
626-875 | 12 hours |
876-1175 | 13 hours |
1176-1550 | 14 hours |
1551-2025 | 15 hours |
2026-2675 | 16 hours |
2676-3450 | 17 hours |
3451-4350 | 18 hours |
4351-5450 | 19 hours |
5451-6800 | 20 hours |
6801-8500 | 21 hours |
8501-10700 | 22 hours |
>10700 | 23 hours |
Effective number of personnel | High | Medium | Low | Limit |
---|---|---|---|---|
1-5 | 3 | 2.5 | 2.5 | 2.5 |
6-10 | 3.5 | 3 | 3 | 3 |
11-15 | 4.5 | 3.5 | 3 | 3 |
15-25 | 5.5 | 4.5 | 3.5 | 3 |
26-45 | 7 | 5.5 | 4 | 3 |
46-65 | 8 | 6 | 4.5 | 3.5 |
66-85 | 9 | 7 | 5 | 3.5 |
86-125 | 12 | 9 | 6 | 4.5 |
126-175 | 12 | 9 | 6 | 4.5 |
176-275 | 13 | 10 | 7 | 5 |
276-425 | 15 | 11 | 8 | 5.5 |
426-625 | 16 | 12 | 9 | 6 |
626-875 | 17 | 13 | 10 | 6.5 |
876-1175 | 19 | 15 | 11 | 7 |
1176-1550 | 20 | 16 | 12 | 7.5 |
1551-2025 | 21 | 17 | 12 | 8 |
2026-2675 | 23 | 18 | 13 | 8.5 |
2676-3450 | 25 | 19 | 14 | 9 |
3451-4350 | 28 | 21 | 16 | 11 |
4351-5450 | 28 | 21 | 16 | 11 |
5451-6800 | 30 | 23 | 17 | 12 |
6801-8500 | 32 | 25 | 19 | 13 |
8501-10700 | 34 | 27 | 20 | 14 |
Effective number of personnel | High | Medium | Low |
---|---|---|---|
1-5 | 3 | 2.5 | 2.5 |
6-10 | 3.5 | 3 | 3 |
11-15 | 4.5 | 3.5 | 3 |
16-25 | 5.5 | 4.5 | 3.5 |
26-45 | 7 | 5.5 | 4 |
46-65 | 8 | 6 | 4.5 |
66-85 | 9 | 7 | 5 |
86-125 | 11 | 8 | 5.5 |
126-175 | 12 | 9 | 6 |
176-275 | 13 | 10 | 7 |
276-425 | 15 | 11 | 8 |
426-625 | 16 | 12 | 9 |
626-875 | 17 | 13 | 10 |
876-1175 | 19 | 15 | 11 |
1176-1550 | 20 | 16 | 12 |
1551-2025 | 21 | 17 | 12 |
2026-2675 | 23 | 18 | 13 |
2676-3450 | 25 | 19 | 14 |
3451-4350 | 27 | 20 | 15 |
4351-5450 | 28 | 21 | 16 |
5451-6800 | 30 | 25 | 19 |
6801-8500 | 32 | 25 | 19 |
8501-10700 | 34 | 27 | 20 |
Determine the complexity level for each management system at each site (when applicable)
Determine the audit time for each management system at each site (as applicable)
In case of multi-site, determine further reduction in audit time for each site (when applicable)
In case of multiple management systems check whether there are the conditions for conducting an integrated audit
Determine the starting point for the total audit time of the integrated management system (IMS)
Adjust the starting point figure by considering factors that may increase or reduce the required audit time.
Calculate the onsite audit duration.
Determine the audit time for surveillance and recertification audits.
Confirm audit time or make adjustments as needed during the certification cycle.
Dette er et mål på hvor mye kortsiktige midler foretaket har i forhold til forpliktelsene selskapet har på samme tidshorisont. Kortsiktig gjeld er forpliktelser som forfaller innen ett år, mens omløpsmidler er midler i foretaket som kan likvideres innen ett år.
Totalrentabiliteten i et foretak er et mål på avkastningen på selve eiendelene. Et viktig nøkkeltall ved lønnsomhetsberegning. Et rimelig nivå er 10 – 15%, men bør ligge over det selskapet betaler for sine lån.
Hvis sum egenkapital < 100 000,- anses soliditeten uansett for å være svak. Egenkapitalandelen viser hvor stor andel av eiendelene som er finansiert med egenkapitalen.